Equipment
10 GPM Amine Plant
16″ OD Gas Train
Gas Cooler
Utility Flair
location
McMullen County, TX
ship date
November 2019
How we helped
Contract/Rental Lease
Installation
Operations
Project Summary
TransTex delivered significant savings for our customer by reducing their LOE associated with their gas treating cost. Our customer had been treating their H2S with a non-regenerative liquid scavenger and came to us for a solution to their increasing costs. After a thorough evaluation by our engineering team, TransTex proposed our modularized 10 GPM Amine Plant as the most cost-effective solution. From the time of order, it took just TWO WEEKS for us to deploy the unit to location and have it online treating gas in McMullen County, TX. TransTex was contracted to provide the full turnkey install and daily O&M service for the project.



Decades Of Experience
Flexible Contracts
Great Customer Service
Industry Leading Runtime