CALL: 713-654-4440

Equipment

  • 150 GPM Amine Plant
  • 125mbtu/hr TEG Dehy (fuel gas)
  • Thermal Oxidizer
  • Primary and Redundant GensetsLocation
  • Webb County, TX

Ship Date

  • May 2019 (TransTex acquired May 2021)

Summary

In May 2021 TransTex entered into an agreement with Bold Production Services to acquire their amine plant fleet. The acquisition consisted of both idle and contracted assets; as well as all operational personnel involved with the contracted assets. This 150 GPM in Webb County had been in-service for 2 years when TransTex acquired and, prior to installation, was a new surplus plant. TransTex was excited to add a larger amine plant to our fleet with a new customer, while also adding several experienced operators to further strengthen our coverage in the Eagle Ford.  Since the acquisition, our customer has steadily doubled their volumes and TransTex has continued to support their efforts by treating below 2% CO2 and 4 PPM H2S. TransTex continues to provide 7 day/week operational support for this facility.