Equipment
60 GPM Amine Plant
125mbtu/hr dehy (fuel gas)
location
Red River Parish, LA
ship date
June 2020
How we helped
Contract/Rental Lease
Installation
Operations
Project Summary
An established customer previously (September 2019) replaced a H2S liquid Triazine scavenger with a regenerative amine treating solution and realized significant chemical savings to treat their sour gas. With additional gas coming online, and proven economics, our customer opted to skip past the Triazine method and add another regenerative amine solution on their new multi-well pad site. TransTex provided the turnkey installation, startup/commissioning, and will be providing ongoing operations and maintenance services of this facility. We are currently in discussions to add a 3rd amine facility for this customer for future production, so stay tuned!