Equipment

Location

  • Scurry County, TX

Ship Date

  •  October 2020

Summary

A North Texas midstream company reached out to TransTex looking to save CAPEX by contracting a gas treating solution upstream of their Cryogenic Facility. Since this location was PSM and required a high level of documentation, Transtex designed and fabricated a 60 GPM amine treater specific to their requirements and needs. The volumes for this location were expected to increase over time; providing a lease option gives our customer the flexibility to upsize treating capacity in the future as volumes increase. TransTex provided the turnkey installation, startup/commissioning for the amine plant and TEG Dehydration unit. 2022 Update: This plant is nearing capacity and treating below 20 PPM CO2!

60 GPM Amine Plant - Scurry County, Tx