Equipment
- 200 mbtu/hr TEG dehydration Unit
- BTEX System
- 5 MMSCFD JT Skid
Location
- LaSalle County, TX
Ship Date
- April 2021
Summary
An established Eagle Ford producer reached out to TransTex in need of fuel gas conditioning for a Frac Job in South Texas. After discussion, we were able to size a JT skid to lean up their gas and optimize the Frac Crew’s equipment performance. This same customer also required dehydrated fuel gas for a few compressors for which we provided a smaller 200mbtu Regen as well as BTEX for their application.